Precautions for Inspection of Automatic Diesel Generators before Operation

In order to make the automatic diesel generator working at the start of the work, the work can be performed normally. Therefore, a series of safety checks are performed on the unit before the diesel generator sets are operated.

First, we must first check the appearance of the unit. Whether the engine is damaged, missing parts, whether the screws are loose, and whether the generator output line or control line is damaged.

Second, check the fuel system need to pay attention to several aspects 1, the fuel is sufficient, whether there is no leakage of the wiring piping or pipe loose (and so on), remove the air in the fuel system.

2. Lubrication system: Is engine oil sufficient? After the new engine or overhauled and overhauled engine is operated for 50 hours, the following maintenance must be performed: engine oil replacement. Engine oil filter replacement. Engine diesel filter replacement. Check valve valve clearance adjustment. Engine exterior screw inspection.

Third, the exhaust system: the exhaust pipe is installed firmly.

Fourth, the cooling system: cooling radiator is enough water. Add rust inhibitor.

V. Battery: Is the electrolyte of the battery at the normal liquid level voltage correct? Is the connector loose?

6. Is the charger operating normally?

7. Inflammable materials and sundries must not be stored around the unit.

Finally, it should be noted that the automatic diesel generator room should maintain good ventilation, and casual people should not enter the equipment room at will.