·The Ministry of Communications carried out supervision work on the pilot project of Ningbo Highway

Recently, the supervision team of the Ministry of Transport supervised and inspected the progress of the three pilot projects of Ningbo Bell and Logistics, Baifu Logistics and Ningbo Port Transportation Company.
The inspection team compared the “Pilot Implementation Plan for the Pilot Project (Unit) and the Feasibility Study Report for the Station Construction (Reconstruction)” approved by the Ministry of Transport, focusing on the construction of the station and the vehicle Supervise the purchase, information system transformation and the operation of the hanging business. At the symposium, the inspection team carefully listened to the introduction of the pilot project enterprise's briefing on the development of the transportation, and made valuable suggestions on the outstanding problems and difficulties in the promotion. At the same time, it is required that the pilot enterprises should further strengthen the summary of the pilot project of hanging transportation, strengthen the analysis of the social and economic benefits obtained from the transportation, and provide valuable experience for the promotion of transportation.
The inspector team also visited and inspected the hanging operation site of Ningbo Port Container Transportation Co., Ltd.

Eyelet Fabric

Eyelet Fabric,Cotton Eyelet Fabric,Wholesale Knit Fabric,Eyelet Fabric By The Yard

SHAOXING BAOYING TEXTILE CO.,LTD , https://www.baoyingfabric.com